PERHITUNGAN VOLUME BORED PILE TANPA TULANGAN PADA PEMBANGUNAN FLYOVER SULTAN AGUNG
Abstract
Full Text:
PDFReferences
Mubarak,Alfa Taras Bulba,Mega Yunita.(2014). Studi Nilai Produktivitas Pekerjaan Pondasi Bored Pile
http://repository.unika.ac.id/14474/1/Fransiskus%20Indrakusumo%20Ogur%2013.12.0066.pdf.
Karya Pondasi, 2015. Cara pelaksanaan Pondasi Bore Pile Mesin https://www.karyapondasi.com/2015/01/cara-pelaksanaanpondasi-bor-pile-mesin.html.Diakses Tanggal 16 Oktober 2020.
Jharwinata, 2019. Metode Pelaksanaan Pondasi Bore Pile http://jharwinata.blogspot.com/2019/04/metode-pelaksanaan-pondasibore-pile.html Diakses Tanggal 18 Oktober 2020.
Bestyanda Rizki I, Wiwied Adhi Prasetyo, Indrastono D.A, dan Muhrozi. (2017). Perencanaan Fly Over Simpang Pelabuhan
Panjang Bandar Lampung dengan PC-U Girder, 6(4), abstrak.
DOI: https://doi.org/10.33365/sendi.v1i02.566
Refbacks
- There are currently no refbacks.
Copyright (c) 2020 Lusia Darasena
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
JURNAL SENDI | Β |
Jurnal SENDIΒ is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.